A sewage treatment plant (STP) construction involvesbuilding a facility to clean wastewater through a multi-stage process: preliminary treatment to remove large solids and grit, primary treatment to settle out organic solids, secondary biological treatment to break down pollutants using microorganisms, and final tertiary treatment for disinfection before the water is safely discharged or reused. The construction requires building and integrating various components, such as bar screens, grit chambers, primary and secondary sedimentation tanks, aeration tanks, and disinfection units.
Construction process overview
  • Site preparation and layout:The site is prepared, and the layout of tanks, pumps, and piping is determined based on the plant's design and capacity.
  • Underground and structural work:Foundation work, excavation for tanks, and the construction of concrete and steel structures are completed.
  • Installation of equipment:Pipes, screens, pumps, and other equipment are installed according to the design specifications.
  • System integration:All components are connected, and the control and automation systems are integrated to ensure the plant operates efficiently.
Key stages and components
  • Preliminary treatment:
    • Bar screens:Remove large floating debris like plastic and paper.
    • Grit chambers:Remove heavy inorganic materials like sand and gravel.
  • Primary treatment:
  • Secondary treatment:
    • Aeration tanks/Biological reactors:Use aerobic microorganisms to break down dissolved and suspended organic matter.
    • Secondary clarifiers:Separate the activated sludge (microorganisms) from the treated water.
  • Tertiary treatment:
  • Sludge handling:
    • Sludge treatment and disposal:Manage the byproducts from the primary and secondary stages, which can involve dewatering and other processes.
Safety considerations
  • Worker safety:Personal protective equipment (PPE) such as helmets, gloves, and safety shoes are mandatory. Masks and goggles are required during sandblasting.
  • Site management:Proper storage of materials, regular removal of waste, and the use of scaffolds for elevated work are essential.
  • Hazard control:Barricades are used around trenches, and safe means of access and egress are provided for all elevated work areas.
Tell us about your requirement
product

Price:  

Quantity
Select Unit

  • 50
  • 100
  • 200
  • 250
  • 500
  • 1000+
Additional detail
મોબાઈલ number

Email

વધુ Products in Sewage Treatment Plants Category

Underground Sewage Treatment Plant

કિંમતની એકમ : પીસ/પીસs

માપનું એકમ : પીસ/પીસs

ન્યૂનતમ ઓર્ડર જથ્થો : 1

ભાવ અથવા ભાવ શ્રેણી : ઇન્ર

Prefabricated Sewage Treatment Plant

કિંમતની એકમ : Unit/Units

માપનું એકમ : Unit/Units

ન્યૂનતમ ઓર્ડર જથ્થો : 1

ભાવ અથવા ભાવ શ્રેણી : ઇન્ર

Portable Sewage Treatment Plant

કિંમતની એકમ : પીસ/પીસs

માપનું એકમ : પીસ/પીસs

ન્યૂનતમ ઓર્ડર જથ્થો : 1

ભાવ અથવા ભાવ શ્રેણી : ઇન્ર

Packaged Sewage Treatment Plant

કિંમતની એકમ : Unit/Units

માપનું એકમ : Unit/Units

ન્યૂનતમ ઓર્ડર જથ્થો : 1

ભાવ અથવા ભાવ શ્રેણી : ઇન્ર